注册 会员中心付费方式入会指南

保险专业资源下载网站

0755-21659566
上传资料 在线充值
腾晟招聘

当前位置:首页 > 财产险培训 > 财产险 > 正文

国际工程索赔和典型案例分析(197页)ppt.rar

国际工程索赔和典型案例分析

如何索赔? 
索赔要素矩阵 - 软实力
从开始到结束 - 合同索赔操作
从开始到结束 - 正确发出索赔通知的要求
工程师
参考通讯条款
索赔的事件或情况
知道或应知后28天
属于TIME BAR条款
“组合式”索赔通知举例Multi-notification of Claim
有关索赔程序条款的风险与谈判要点
If the Contractor encounters adverse physical 
conditions which he considers to have been 
Unforeseeable, the Contractor shall give notice 
to the Engineer as soon as practicable.      
如果承包商认为遇到不可预见不利物质条件,应尽快通知工程师。     
This notice shall describe the physical conditions, 
so that they can be inspected by the Engineer, and 
shall set out the reasons why the Contractor 
considers them to be Unforeseeable.      
此通知应当:(i)描述物质条件以便工程师进行检验,并(ii)提出承包商认为不可预见的理由(请注意:该份通知应同时满足上述两个条件的要求)。
FIDIC CONS/P&DB 
4.12不可预见物质条件
“If and to the extent that the Contractor 
encounters physical conditions which are 
Unforeseeable, gives such a notice, and 
suffers delay and/or incurs Cost due 
to these conditions, the Contractor shall 
be entitled subject to Sub-Clause 20.1 … to:      
“如果承包商遇到不可预见的物质条件,并发出此项通知,因这些条件达到遭受延误和(或)增加费用的程度,承包商应有权根据第20.1款…要求:         

你可能正需要这些

立即下载 收藏

如何才能下载资料?

资料信息

  • 更新时间:2018-04-04
  • 资料性质:授权资料
  • 文件大小:2.40MB
  • 下载次数:2
  • 文件格式:RAR
  • 所需圈币:100
  • 收藏次数:3次
分享到:
新手入门
入会指南 付费方式 新手帮助
关于我们
公司简介 法律申明 网站地图
关注我们
官方微信 官方微博 意见反馈
联系我们
联系QQ:564358161 微信咨询:13049846002 客服热线:13049846002

圈中人客服电话

0755-21659566

周一至周五(9:00-18:00)

Copyright © 2009-2022 深圳市圈中人电子商务有限公司 粤ICP备05047908号网站建设:自己人

您是否真的需要安全退出?

确认退出

意见反馈